Case Introduction
This project belongs to CCCC Second Engineering Bureau. In order to reduce the cost of raw material procurement and transportation, the raw materials of this production line come from mining, and the finished materials are sold to the outside, which has contributed to the local economic development. Its design capacity is: 1000-1200 tons/hour, the feed particle size is below 1000mm, and the discharge particle size is: 1-3, 1-2, 0.5-1, 5 or less. The equipment uses the heavy hammer crusher, light hammer crusher and 6 vibrating screens of Xingaonai Heavy Industry.
Application areas
Commercial mixed station
Railway construction
high speed railway
Urban infrastructure
roadworks
Highway
water conservancy project
cement factory

Related configuration